A distinct interior for every service
At 7611 Pine Valley Drive in Vaughan, Ontario, Canada, FCC Builders Canada is completing a tenant fit-out that brings a medical clinic, pharmacy, med-spa and law office into one facility. Each area needs its own character, while the construction must work as one coordinated project.


Design references from the Studio Tobias finish schedule. These are not completed-project photographs.
Location: 7611 Pine Valley Drive, Vaughan, Ontario, Canada
Uses: Medical clinic, pharmacy, med-spa and law office
FCC role: Complete tenant fit-out and corrective work to prior construction
Our scope includes correcting deficiencies in work undertaken before FCC became involved and completing the interior for its intended uses. The finish package sets a different direction for each service, from practical clinical spaces to a welcoming med-spa and formal professional offices.
A connected clinic and pharmacy with distinct purposes
The main-level plan places medical care and pharmacy services within the same facility. A shared warm-neutral floor palette connects the spaces, while their reception points, cabinetry and consultation areas give each service a defined place.
Medical clinic

The clinic combines examination rooms, reception, waiting and a nurse station. Its finish scheme pairs neutral wall surfaces with fluted wood-look detailing, creating a welcoming setting for patients without making every room a feature space.
The schedule calls for fluted panels below a chair rail in the waiting area and at the nurse station, with commercial wall protection above. In the clinic corridor, wall protection and a bumper rail respond to everyday movement through the space.
A half-height partition with glazing above is shown at the nurse station to allow light through. This detail illustrates how the design balances defined work areas with a more open visual connection.
Pharmacy

The pharmacy has its own service counter, waiting area and consultation room. The reference image uses a framed wood-look surround, shelving and a clearly identified counter to distinguish pharmacy service from the adjacent clinic reception.
Commercial wall protection is specified for the customer-facing area and behind the counter. The consultation room continues that treatment, with a protective chair rail on walls without cabinetry.
That room gives consultation a separate setting from counter transactions. Its interior belongs to the same facility, while the counter and cabinetry establish a recognisable pharmacy identity.
A softer setting for consultation and treatment
The med-spa takes a different direction from the clinical and pharmacy areas. Curved reception details, layered neutral textures and wood-look finishes establish a quieter visual atmosphere. Within that palette, the schedule distinguishes reception, consultation, treatment and facial rooms.


Design references from the project finish schedule, pp. 25 and 27; not photographs of completed work.
A recognisable arrival point
The reception reference centres on a curved desk with a fluted oak-colour finish. ARTE Velours is specified for the surrounding walls, with Vescom Walen inside the arched details. The waiting-area notes add a wave-pattern decorative accent panel. Together, these elements give the med-spa a distinct arrival experience within the larger facility.
Different finishes for different rooms
Three treatment rooms are identified with ARTE Textura Puro in Mushroom and a natural-oak accent panel. Two facial rooms use the deeper Lava colour with an oak accent. These room-specific selections introduce variation while keeping the med-spa visually connected.
The flooring package specifies wood-look luxury vinyl plank through the med-spa and carpet plank in the consultation room. The washroom has its own finish combination: alternating dark matte and brown glossy mosaic tiles behind the vanity. These are scheduled selections; final installed finishes remain subject to project coordination.
A more formal interior for professional services
The law office uses a more structured reception and meeting-room palette. Wood-look accents connect it to the wider facility, while deeper colours and distinct executive-office finishes give it a professional character of its own.


Design references from the project finish schedule; not photographs of completed work.
Reception and meeting spaces
The reception accent wall is specified in ARTE Velours 67551. High-traffic hallways receive commercial wall protection. In the boardroom, a fluted feature wall and textured wallcoverings establish a separate meeting setting; carpet plank is specified for this room within the wider wood-look vinyl floor scheme.
Individual rooms without losing consistency
The executive offices use two different Starlit Stitch colours: Ancient Lake, a blue tone, and Mystic, a light grey. Fluted accent panels provide a common detail across those rooms. The smaller associates’ offices are specified with painted walls, reserving the more elaborate finishes for selected spaces.
Supporting rooms also receive a considered treatment. The kitchenette specification includes a textured, wood-inspired porcelain backsplash. The law-office washroom uses a cobalt-coloured tile accent behind the vanity, giving it a different character from the med-spa washroom.
Bringing the four interiors together
FCC’s assignment combines a complete tenant fit-out with corrective work to address deficiencies left by earlier construction. That starting point makes the condition of existing work part of the construction scope, alongside the new interiors.


Site photographs during construction, taken from FCC’s project video.
Corrective work alongside the fit-out
For an owner taking over a partially built unit, the visible remaining finishes do not describe the entire job. At Pine Valley, FCC’s role includes rectifying prior work as well as completing the intended spaces. For prospective owners, this makes understanding existing work an essential part of planning the remaining construction.
Coordination at the finish interfaces
The schedule connects several trades at the same locations: chair rails meet wallcoverings and panelling; tile meets vinyl or carpet; cabinetry meets wall finishes; and reception features meet lighting and electrical points. These interfaces need coordinated dimensions, material transitions and sequencing to deliver the intended appearance.
The construction photographs show the interior taking shape, including glazed partitions, cabinetry, a curved reception form and ceiling openings awaiting further work. The design references show the intended finish direction. Together, these details connect the finish concept with the construction taking place on site.
Turn your business requirements into a coordinated interior
Pine Valley is relevant to owners planning a medical clinic, pharmacy, med-spa or professional office, whether as a standalone business or within a shared facility. It shows how a coordinated finish package can give each service its own identity while bringing the construction together under one scope.
For a similar project, start with the rooms and services each operator needs. Then connect the layout, equipment, building services and finishes before committing to a construction sequence. FCC’s Interior Fit-Outs & Tenant Improvements service provides the route into that discussion.
Can FCC review a partially completed fit-out?
Yes. Pine Valley includes corrective work to construction undertaken before FCC’s involvement. For your project, share the available drawings, current site photographs, inspection information and known outstanding work so the scope can be assessed.
Can each business have a different interior?
Yes. Pine Valley’s schedule combines a shared material palette with separate reception treatments, room finishes and accent details. The design and construction teams need to coordinate those choices with the actual operations and project requirements.
Where should I start with costs and approvals?
Use our medical clinic fit-out planning guide for the broader discussion of clinical requirements, budgeting and approvals. This project case study focuses on Pine Valley’s scope and interiors; its finish selections do not establish clinical suitability, licensing or regulatory approval for another facility.
Useful next reads
Before You Sign the Lease: 12 Unit Checks - identify existing-condition issues before committing to a space.
Leasehold Improvements in Ontario - understand the landlord and tenant scope before pricing the work.
Deep Toor, Director of Operations, FCC Builders Canada. Design reference images: Studio Tobias finish schedule. Construction photographs: FCC project video.