You have found a promising space. The rent works, the location fits and the landlord is ready to sign. Then someone asks who is paying for the electrical upgrade. Suddenly, the lease looks different.
Leasehold improvements are the changes that make a leased unit suitable for your business. Who pays depends on the negotiated lease and work agreement. A tenant allowance can help, but it does not establish that the premises are suitable—or that all construction costs are covered.
Start with the handover condition
Ask for a written description of what the landlord will deliver. “Vanilla shell” is not a complete specification. Identify the condition of floors, ceilings, washrooms, storefronts, heating and cooling, electrical service and plumbing connections. Record who corrects deficiencies and when the space becomes available for work.
At FCC’s Clarence Street plaza in Brampton, the published scope includes more than 35 commercial units across three buildings, with demising walls and service rough-ins for tenant customization. That distinction matters: a completed shell and an operating business interior are different construction packages.
Who pays for the improvements?
Landlord work: items specifically promised in the lease or landlord work letter, with an agreed delivery standard and deadline.
Tenant work: the layout, finishes, equipment connections and other changes assigned to the tenant.
Tenant improvement allowance: a negotiated landlord contribution. Confirm eligible expenses, supporting invoices, payment timing, taxes and the deadline for claiming it.
Turnkey work: the landlord arranges an agreed fit-out. Define the specification, approval process, substitutions and treatment of changes.
A rent-free period and a cash allowance solve different problems. One reduces occupancy costs for a period; the other contributes to eligible work. Neither automatically pays a contractor’s deposit. BDC’s commercial leasing guide explains these distinctions. Have your lawyer settle lease obligations, restoration requirements and ownership of improvements before signing.
Build a budget around the actual business
Do not compare a light office refresh with a clinic, restaurant or full shell fit-out using one square-foot rate. Start with a measured layout and equipment list, then price the work by category:
Survey, design, engineering, permit applications and required investigations.
Selective demolition, waste removal and reinstatement of disturbed areas.
Partitions, doors, ceilings, flooring, millwork and decoration.
HVAC distribution and capacity, lighting, power, plumbing and fire protection.
Accessibility work, signage and agreed base-building connections.
Owner equipment, furniture, IT, moving, financing and opening cash.
A separately identified contingency for unresolved conditions.
Illustrative allowance calculation—not a market quote: a hypothetical 2,000-square-foot unit with a negotiated $30-per-square-foot allowance provides $60,000. If eligible construction costs total $180,000, the tenant’s share is $120,000 before other costs and taxes. If reimbursement occurs after completion, interim cash requirements may be much larger than that final share.
Use FCC’s construction-budget guide for the wider budget structure. Obtain a current estimate for your property rather than treating this example as a GTA price benchmark.
Check services before falling in love with the layout
An electrical panel does not tell you how much usable capacity is available. A rooftop unit does not prove it can serve the proposed occupancy. Have the relevant consultants check loads, equipment condition, ventilation, drainage routes and landlord restrictions on roof penetrations or shared systems.
For a restaurant, the exhaust route can determine whether the location works. For a clinic, plumbing locations and patient privacy can reshape the plan. Resolve those constraints before finalizing the number of rooms or seats.
Before-signing checklist
Confirm the proposed use with municipal planning staff and review the existing permit history.
Arrange a site walk-through with the design and construction team.
Obtain a landlord/tenant responsibility schedule and service-capacity information.
Confirm landlord drawing approvals, contractor access, insurance and working-hour rules.
Identify permit requirements, long-lead items and realistic possession-to-opening dates.
Have legal and financial advisers review allowance payments, lease terms and financing together.
Ontario notes that a change-of-use review or permit can be necessary even where little physical work is proposed. Landlord consent does not replace municipal approval.
What owners often overlook
Decide who pays if an existing service is inadequate, a permit review changes the scope or landlord work arrives late. Also confirm whether improvements must be removed at lease end. Those questions belong in the lease negotiation, while both parties still have choices.
Common questions
Can improvements be financed?
Possibly. BDC’s renovation-financing guidance explains why lease length and landlord cooperation matter. Eligibility, security and repayment terms depend on the lender and business.
Can construction start during the fixturing period?
Only when access, required approvals, permits and contractual arrangements are in place. A fixturing period is an opportunity to do the work, not permission to bypass those steps.
Bring the space into the conversation early
Before committing to a lease, send FCC the address, approximate area, intended use, available drawings and landlord work letter. Our Interior Fit-Outs & Tenant Improvements and pre-construction services can help connect scope, budget and opening plans. Discuss your proposed fit-out with FCC.
Prepared November 18, 2026. Deep Toor, Director of Operations, FCC Builders Canada. General construction-planning information; obtain project-specific design, lease and financing advice.