Brampton, Ontario

143-145-147 Clarence St. Plaza Brampton

Project Overview

FCC Builders Canada constructed a multi-building commercial plaza in Brampton, Ontario. The development consisted of three separate single-storey buildings containing over 35 commercial units designed to accommodate retail, office, and food service tenants. The project was strategically located in a high-traffic area of Brampton and was designed to provide the community with a modern and accessible retail destination.

FCC’s general contracting scope connected site preparation, three building shells, utility coordination and common access areas. The delivery goal was to provide commercial units ready for tenant customization, with the base-building work established before individual fit-outs.

Interior of a building under construction with drywall, insulation, and construction tools, covered with plastic and orange safety barriers.

Scope of Work

The scope of this project involved full site development and the construction of three separate commercial buildings. Work included excavation, foundation installation, steel structure erection, roofing, exterior cladding, glazing, and complete site servicing. FCC Builders Canada also constructed large parking areas, driveways, and pedestrian walkways to ensure smooth traffic flow and customer access.

The interior of each unit was completed to a “vanilla shell” standard, providing future tenants with open, flexible spaces that could be customized for retail, office, or restaurant use. Key components of the project included installation of fire-rated demising walls, individual mechanical and electrical rough-ins for each unit, and energy-efficient windows and doors.

Key Features of the Project

01. Construction of three modern commercial buildings with a total of 35+ units.

02. Individualized unit layouts that allow tenants to complete their own interior fit-outs.

03. Durable exterior finishes including brick, architectural panels, and high-performance glazing.

04. Full mechanical and electrical systems designed for individual tenant metering and flexibility.

05. Comprehensive site development, including stormwater management, asphalt paving, curbs, and sidewalks.

06. Installation of parking for both customers and tenants, with dedicated loading and service areas.

07. Accessibility features and compliance with Ontario Building Code and AODA standards.

A parking lot outside a strip mall with various retail stores, including Save Max and Pizza Pros, parked cars, a small tree, and a partly cloudy sky.

Project Outcome

The development delivered more than 35 commercial units across three single-storey buildings. Fire-rated demising walls and mechanical and electrical rough-ins formed part of the shell scope, while parking, walkways and service areas supported the development as a whole.

Planning a plaza? Define base-building and tenant responsibilities early. Our multi-tenant plaza guide discusses layouts, servicing and fit-out coordination.

Public planning reference: Ontario’s building permit guide explains the relationship between permits, zoning and proposed use. Individual tenant layouts and uses can introduce additional requirements beyond the shell construction.

General contracting · Interior fit-outs & tenant improvements · All projects