Opening a Daycare in Ontario: Building Conversion, Costs & Approval Checklist

The unit has plenty of indoor space. But where will the children play outside—and can they get there safely?

A daycare feasibility review should begin with the whole site, intended age groups and licensed capacity. A good-looking floor plan is not enough if the outdoor arrangements, approvals or building systems do not work.

Two connected approval routes

Construction approvals and child-care licensing are distinct. The municipality assesses applicable planning and building requirements; the Ministry of Education administers licensing. Public-health, fire and other requirements also need coordination.

Ontario’s child-care licensing guidance explains the building-related approvals and application steps. Confirm the process before construction. A building permit alone does not authorize operation as a licensed centre, and a proposed licence application does not authorize construction.

Define the programme before choosing the unit

  • Age groups, proposed capacity and hours of operation.

  • Play activity rooms, sleep/rest arrangements and storage.

  • Washrooms, handwashing, diapering and food-service arrangements as applicable.

  • Staff, administration, cleaning supplies and secure storage.

  • Outdoor play, supervision, arrival and controlled access.

Work with the operator and designers to establish which areas count toward required usable space. Corridors, fixed storage and service areas should not be assumed to count as activity-room space.

Check the outdoor space early

The Child Care Centre Licensing Manual addresses indoor space, playgrounds, supervision and permitted alternatives. Requirements vary with the programme; any alternative arrangement needs the applicable approval rather than an assumption that nearby public space will suffice.

Assess access, fencing, drainage, shade, surfaces, maintenance and separation from vehicles. Confirm the landlord’s rights and obligations for outdoor areas in writing. An indoor construction allowance can look complete while leaving the entire playground unfunded.

What drives daycare construction costs?

Separate the fit-out from site work, equipment and licensing-related preparation. Obtain an estimate for a defined layout and approved programme rather than using a per-child figure as a substitute for design.

  • Existing-condition surveys, design and permit submissions.

  • Demolition, partitions, doors, finishes and acoustic treatment.

  • Plumbing, washrooms, hot water and age-appropriate fixtures where required.

  • Ventilation, temperature control, lighting and electrical work.

  • Fire protection, exiting, accessibility and secure entry.

  • Food preparation, cleaning and storage provisions.

  • Outdoor works, fencing, drainage and any selected play equipment.

  • Furniture, supplies, fees, contingency and operating cash outside the contract.

A former office may require substantial changes even when its finishes are in good condition. A former daycare also needs review against the new programme and current requirements. This guide does not claim a verified Ontario price range or a completed FCC daycare project.

Assess a conversion as a whole building

Have the design team evaluate occupancy, fire separations, exits, washrooms and accessibility. Check whether the existing ventilation and services can support the proposed use. Coordinate any roof equipment, shared services or work outside the unit with the landlord.

FCC’s Brampton office-to-school conversion illustrates broader institutional conversion experience. It is a school project, not a daycare case study or evidence of child-care licensing expertise. The transferable lesson is to assess systems and approvals alongside room layouts.

Approval and construction checklist

  1. Confirm local demand and programme assumptions with the operator.

  2. Check zoning, property constraints and landlord permissions.

  3. Coordinate the proposed layout and outdoor plan with licensing requirements.

  4. Identify building, fire, public-health and other required submissions.

  5. Prepare a coordinated design, scope, estimate and funding plan.

  6. Obtain required approvals before the relevant work begins.

  7. Plan inspections, testing, cleaning, documentation and operational readiness.

Ask the relevant service system manager about local child-care planning and funding processes. Funding participation is separate from whether the building can be constructed or licensed.

What operators often overlook

Storage is easy to sacrifice on a concept plan and difficult to add later. Walk through a typical day: coats, food deliveries, sleeping equipment, cleaning, outdoor transitions and waste. Make space for those activities without compromising usable rooms or circulation.

Also identify who maintains outdoor elements and shared routes. Construction handover is the beginning of an ongoing operating responsibility.

Can a retail unit become a daycare?

Potentially. Zoning, layout, building systems, outdoor arrangements and licensing requirements must all support the proposed use.

Does licensing approval replace building inspection?

No. Maintain separate checklists and confirm evidence required by each authority.

Start with the site and programme

Bring FCC the location, proposed age groups and capacity, available drawings and outdoor-space information. Our pre-construction and interior fit-out services can help organize the construction side. Discuss the feasibility of your proposed centre.

Prepared November 18, 2026. Deep Toor, Director of Operations, FCC Builders Canada. General construction-planning guidance; licensing decisions remain with the responsible authorities.